watercube(watercube的音标)
本篇文章给大家谈谈watercube,以及watercube的音标对应的知识点,希望对各位有所帮助,不要忘了收藏本站喔。
本文目录一览:
鸟巢和水立方的英文怎么说?
1.北京奥运国家体育场就是俗称的"鸟巢"
"鸟巢"的英文名称是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)
鸟巢英文单词是bird nest
2."水立方"的英文是water cube Beijing National Aquatics Cente或water cube
“鸟巢族乎”和“水立方”的英文简介
Beijing National Stadium
The 启弊Beijing National Stadium (traditional Chinese: 北京国家兆旁悉体育场; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guojiā Tǐyuchǎng; Tongyong Pinyin: Běijīng Guojiā Tǐyuchǎng), also known as the National Stadium,[1] or the "Bird's Nest" (鸟巢) for its architecture, is a stadium under construction on the Olympic Green in Beijing, China that is scheduled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to the Beijing National Aquatics Centre.
Design
In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog de Meuron collaborated with ArupSport and China Architecture Design Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power[
Beijing National Aquatics Centre
The Beijing National Aquatics Centre, also known as the Water Cube (or abbreviated [H2O]3 [1]), is an aquatics centre that was built alongside Beijing National Stadium in the Olympic Green for the 2008 Summer Olympics. Ground was broken on December 24, 2003.
Design
In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog de Meuron collaborated with ArupSport and China Architecture Design Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by
Suntech Power[
[img]什么是水立方
国家游泳中心又称“水立方”(Water Cube),位于北京奥林匹克公园内,是北京为2008年夏季奥运会修建的主游泳馆,也是2008年北京奥运会标志性建筑物之慧闷一。
它的设计方案,是经全球设计竞赛产生的“水的立方”([H2O]3)方案。其与国家体育场(俗称鸟巢)分列于北京城市中轴线北端的两侧,共同形成相对完整的北京历史文化名城形象。 “水立方”中方建筑师胡小明在接受官方网站专访时表示,“水立方”的名字灵感来源于“一个方盒子”、许多“水泡泡”和许多的“水分子”。
胡小明回忆说,在国家游泳中心进入竞标阶段后,中方的几位建筑师和澳大利荘TW公司一直都在思考给野旁这个建筑取一个什么样的名字。当时的构思是“一个方盒子”,容纳了许多“水泡泡”和前脊弯“水分子”的形象,大家为构思兴奋了很久,但却没有立即给它取一个确切的名字。
“有一天晚上工作很晚了”,胡小明说,大家在工作之余又开始为这个“方盒子、水泡泡和水分子”的形象起名字,于是,五花八门的创意都涌向了这个方盒子。在这些创意中间,一个英文名“水的立方体”(Water Cube)既表达了方形的,又与水相关,引起了很多人的注意。经过大家的深思熟虑后,确定了“水立方”这一简洁明了的名字。
water cube是单数还是复数
water是不可数名词
但在“水立方”这个词组中,water是作为cube的修饰。
因为cube是可数名词,作为数橘名词词组的主体,因此water
cube是可数名词薯昌团,而且是单数。
但在正常使迅察用过程中,因为水立方全世界只有一个,所以在使用冠词的过程中用“the”
water cube是什么意思
Water Cube
水立方
水的立方慎谨体
水立米
国家游泳中心
Hot water ice cube 姆渗孝茄潘巴现象
Water Magic Cube 水魔方
water-cube 水立方
No one in the Water Cube who witnessed the race knew who had won
当时在水立方游泳馆观看比赛的人都不知道究竟是谁赢得了比赛。
This sign in the media work room at the “Water Cube” caught my eye when I was there the other evening for the Olympic swimming test event.
当我在“水丛察立方”奥运馆参加奥运会的游泳测试活动的时候,这个贴在媒体工作办公室门前的小纸片引起了我的注意。
关于watercube和watercube的音标的介绍到此就结束了,不知道你从中找到你需要的信息了吗 ?如果你还想了解更多这方面的信息,记得收藏关注本站。